GUICHET UNIQUE DU FONCIER

PROGRESS
0%
Previous
Next

The master plan of the designed project shows the optimized distribution of both private and public parking lots. due to the plot shape, parking lots must be in the area in front of the main stairs and platform approach of the project. side parking lots are five private spaces and could have access from a back door for their offices. a building form is a rectangular-shaped unit with three main blocks forming the whole design as solids and transparent glass elements. ground floor plan slides from the building approach through an outside platform into a sas reaching a hall with double-sided waiting areas and facing a seven office desk for user service. service blocks are on the left and right forming both the staircase and the toilet areas. with a whole back channel for main offices and their services at once.

IMAGE GALLERY